Wednesday, January 26, 2011

Sanyi Anti Adeposa Tea

Aliens - The Return


just seen again, this jewel of action films. And even if one or the other seems a bit dusty at this 25-year-old factory here, producers and directors like to learn something. I hardly films are known to be structured in so logical, clean, and have succeeded dramatically.

And it is a second part. Director and script writer James Cameron, was still largely unknown - the "Terminator" at the time of his treatments for "Aliens" not yet in operation - had wisely decided not simply a similarly knitted to make successor.

Instead, he mixed his ideas to a military operation in the future with the idea of what would happen if there were more than one of the creatures. a high-tech-equipped troops in a hostile environment - are intentional parallels to the Vietnam War, as Cameron is with "very much fire power and very little wisdom" means.

problem ran the shooting, which were exchanged at the beginning Corporal Hicks Actor James Remar against Michael Biehn and also the Director of Photography Richard Bush. Moreover, there was great tension between the British film crew, unionized and clear working hours, and James to Cameron, who was believed to also not able to Ridley Scott's successor. Gale Anne Hurd had a female producer, also in a difficult position

stressful also designed to work with composer James Horner, who had one and a half weeks time for composing and uploading of film music. With the results of Horner was "80 percent satisfied," yet there was an Oscar nomination. The two men had so much trouble that they got together only ten years later - here for the cinematic masterpiece "Titanic".

And yet we see excellent, what with 18 million dollar budget on all the legs can provide, without any CGI, and with classic tricks such as blue screen, models, objects suspended on wires and a power loader, which is driven in fact by a bodybuilder. And, incidentally, also worked luminaries in their fields such as Stan Winston (animatronics) and Syd Mead (Art Director, about the "Blade Runner") to this film.

My favorite scene is the first "Plot Point", where the Marines to penetrate the cocooned colonists and then there are decimated by the aliens. Rarely has such a good representation of chaos, confusion and struggle seen.

eighth when watching it: today's "regular" version is the director's cut, nearly 17 Minutes longer than the theatrical version.

Tuesday, January 18, 2011

Rathchet Clank Rhino Schimatics

residual risk


Ah, there he is again, the German television movie event, here at Sat.1. Not this time, in two parts would be "residual risk" classified like after "The China Syndrome" and "Silkwood." Sorry, not quite succeed. Not even to some extent.

But like in the movie we hide from the end at times to the beginning. Ulrike Folkerts plays the boss of a nuclear power plant safety, of course, legitimate film dramatically divorced, two children who would rather be with the journalist father and his pregnant girlfriend. And then there's the marketing Heinz, who will miss the nuclear power plant operators a better image. Pays this - of course only after he was dragged to the "right" side - according to cinematic hubris with his life. One does not know exactly why, but he has exposed to the same radiation as our leading lady. I also do not know how to protect yourself would make sense to a breathing mask from radiation, which in its strength is said to be responsible for a mass extinction.

A transformer fire (Krümmel Greetings) is to be concealed from the nuclear regulatory authority, the old reactor is also being modernized. The Chief Engineer is completely against it, and then of course bad for the nuclear lobby murdered. Imagine, the whistles of Vattenfall, E. ON and EnBW would hire a professional killer. The former may not necessarily recommended as the operator of a nuclear power plant, but we want to stay with a sensitive topic like in serious ways.

has now the script writer of a drama about a nuclear power plant the same problem as that of an airplane disaster movie: he must be a very safe, with multiple redundant systems equipped technical trick the system into. That happens here, in which the Einfassringe of the reactor were too large and were then taken by simple hydraulic press in the right shape. This lead to a covered-up incident already in his eighties, is equal to the then explains the childhood leukemia cluster in the Elbe marshes. You could also search for the real cause, but so be it, everything is all just fiction.

One wonders already, how this should then have been taken by the competent authorities as if reactors under extreme supervision stood, the radioactivity would not be inside and outside the containment, the concrete dome and the area is strictly monitored. It also calls Folkerts character, all reactors of the same type to be ended immediately. Well, since there was always the same sloppiness? You do not know.

Why not if you want to draw attention to something for example, no story about the disposal does has obviously dramatic reasons. An exploding power station makes just a lot more impact. As a friend of disaster movies is my way selbige also denied yet. It is, after the conversion and improve performance simply that the moderator rods could no longer enter. No word why this was so.

information only: gets out of control of the reactor, the rods are automatically in its holder, because no one needs to do something. If the temperature continues, the containment is flooded. After that you then of course, a concrete dome full of highly radioactive water is no longer working order, including reactor but not meltdown. Or even explosion.

The documentation for this movie I have seen only in snippets. But since it is argued is uncontradicted and accepted that by 2020, Germany could be moved completely to renewable energy. Unfortunately, this is not correct, because to date there are no outlines a system for power storage in the necessary scale. So we will have some time to rely on conventional power generation.

This film has not convinced me NPP would pose such a big risk that they would switch off immediately. Cinematically, he is not convincing with his two parallel plot lines over time. Similarly, a Lot of details missing here for me now the time and inclination.

The documentary ends with a look at an art installation on concrete on the grave stones are the names of all deputies of the Bundestag. It is to remind them to make the right decision. I find it remarkable to broadcast threats.

Friday, January 14, 2011

Benefits Getting Piercing

No referendum: Aachen also increases as "expects Trianel the situation nicely" from coal project Krefeld

PM www.we-Klimaretter.de

"Aachen rises from coal project - Stadtwerke Aachen on a coal power plant do not participate in Krefeld. As the Stawag announced on Thursday, the Stawag will only participate in the realization of a gas turbine power plant (CCPP) in Chempark on to the project ... "

The municipal bond Trianel planned in the chemical park Uerdingen originally the construction of a 750-megawatt coal-fired power plant. The discussion of methods for emission-related permit was conducted last year, against the project were 23 000 objections received. From Trianel it said at the time, you go out with a permit in the first quarter of 2011, the decision to build the coal plant could come in the spring.

The Energy of the Federal Government and the extension of the nuclear power plant run times, allowing coal-fired power is unprofitable came, but also in Krefeld considerations on the switch, a gas power plant: the option for a combined cycle power plant as an alternative to coal power plant was under consideration, the Stawag. With a final result is not expected before May 2011.

In September last year in Aachen also set up a citizens' initiative, which would pass through the exit of the municipal utilities from coal-fired power plant project by referendum. Proposed power had the Dachau in Bavaria: With a popular vote the Dachau decided against the participation of their utility to the Trianel coal power plants in Krefeld and Lünen.

More on the participation of individual municipal utilities in coal-fired power plant projects in Krefeld, Lünen and Brunsbüttel published by the Climate Alliance on the Intersetseite www.stadtwerke-kohlefrei.de.

Here is the PM of Stawag

No participation of STAWAG in a coal-fired power plant in Krefeld
The STAWAG decided together with the Trianel and other public utilities, for the Krefeld-Uerdingen the option of a combined cycle power plant (gas and steam turbine power plant) to . Check
Stadtwerke Trianel cooperation builds on cooperation with public utility power generation capacity so that they strengthen their competitive position and offer customers attractive prices. In addition to the already in 2007 went into operation combined cycle power plant in Hamm-Uentrop Trianel has more power plant sites in the planning and implementation.
This is the site Uerdingen particularly attractive because pressure is sensed by the Chempark Krefeld steam and heat, which result in excellent efficiency and improve the ecological balance of the power plant.

Now, for the power plant project is an option as gas and steam turbine power plant - tested - as an alternative to coal-fired power plant. With a final result is not expected before May 2011.

The STAWAG will participate by voting in their bodies in the implementation of a combined cycle power plant on the project. The Chancen für ein solches Kraftwerk am Standort Krefeld-Uerdingen schätzt sie als vielversprechend ein. Sollte am Bau eines Steinkohlekraftwerks festgehalten werden, wird die STAWAG aus dem Projekt aussteigen.

Aachen, 13. Januar 2011

Wednesday, January 12, 2011

Met Art - Is It Safe?



BUND reicht Stellungnahme zum Antrag für die 6. Teilerrichtungsgenehmigung zum Steinkohlekraftwerk Lünen ein

Zum Ablauf der Beteiligungsfrist hat der BUND gestern eine umfangreiche Stellungnahme zum Antrag der Trianel Kohlekraftwerk Lünen GmbH für eine 6. Teilerrichtungsgenehmigung eingereicht. Die Umweltschützer werfen den Kraftwerksplanern vor, sich in Bezug auf die schädlichen Kraftwerksemissionen die Situation „schön zu rechnen“. The District Government Arnsberg must therefore reject the request

on more than 100 pages, supplemented by expert opinion and has the power of the BUND planners massive error in the calculation and assessment for people and nature harmful power plant emissions. Unlike claims Trianel sufficient by the Higher Administrative Court Münster been calling for exposure prediction and impact assessment for the protected fauna and flora habitat areas by no means the legal requirements. The request for immediate compliance should therefore be suspended until the conclusion of the court dispute to the preliminary decision. In this regard had also the verdict in the proceedings vor dem Europäischen Gerichtshof abgewartet werden.

Der BUND hält das Vorhaben nach wie vor für „nicht genehmigungsfähig“. Auch durch die geplante geänderte Betriebsweise könnten weder die zulässigen Grenzwerte für Feinstaub und Quecksilber, noch die Zielwerte für Cadmium, Nickel und Blei eingehalten werden. Aufgrund fehlerhafter Annahmen in der Immissionsprognose sei zu befürchten, dass die Einträge von Schwermetallen und anderen Schadstoffen in die Umwelt wesentlich höher ausfallen, als angegeben. Damit würde die Bevölkerung nach wie vor mit unzulässig hohen Zusatzbelastungen durch das geplante Kraftwerk gefährdet.

Auch die im Einwirkungsbereich des Kraftwerks FFH-lying areas such as along the lip and Cappenberger forest are still seriously threatened. Indisputably caused by the proposed coal power plant pollution by Lünen an additional sulfur dioxide and ammonia. This led to the eutrophication and acidification of sensitive plant communities such as oat grass pastures and the protected natural forests. In the view of the Bund but it may already because of the high preload be no sound with the conservation objectives of the Habitats areas further furnish more. Also to be feared that due to the deficiencies in the submitted immission and contrary to the representations in the FFH compatibility study are much more heavy metals in both standing and flowing waters in the database. The opening of Kühlturmabflut and waste water is at risk of the additional heat and the entry of mercury in fish fauna of the lip, such as the strictly protected river lamprey.

BUND Trianel threw it "unfair practice" before. The assumed apparent decrease in the bias to the forecast horizon from 2007 to 2011 went so back not to a real reduction of the exposure, but only to the choice of a more favorable for the plant operator computing model. But despite this "impropriety" in the certified evaluators Trianel itself many times exceeding the authorized levels. Only in a variety of "single cases" they would come to the conclusion that the power plant making up anything. Click

press release in the original title

Sugarpaste Model Motorbike

Rapunzel - New verföhnt


I had let it distract before Christmas, "Rapunzel" to see - the times I had not done. "Rapunzel" is next "Inception" of the films I've seen, 2010 probably the best. The two works can hardly be compared, of course - "Rapunzel" leaves but also good humor, a good story. And by the way the fiftieth Disney feature film.

The story is based loosely on the fairy tale, but adds a love story, including the thief Flynn and a bunch of supporting characters. This includes Rapunzel's friend Pascal, a tiny chameleon, the Disney-typical funny sidekick. And if it's a Disney movie, of course, is sung, at the end there is a version of the main theme sung by Monrose. Where you see the way still possible that the three girls can sing, in fact, not whether one likes it or the music.

Instead, there are a bunch of cute gags, one for adults fairly interesting plot and a suitably large dose of kitsch. As such, the scene would be with the sky lanterns. Hach, was the beautiful. Can you (so I ) polish off even a few tears in the face of Rapunzel's childlike enthusiasm. I have also never seen a movie in which the 3D effects are used so appropriate, not even in "Avatar" .

Our two virtual actor do their job quite well, as the German voice actors Moritz Bleibtreu and Alexandra Neldel. Which I hereby forgive their terrible performance at "Bang Bang Boom" .

the best scoop I leave but for the final on. "Rapunzel" is, believe it or not, the second most expensive film of all time. More expensive was only the third "Pirates of the Caribbean" part, and you can not, strictly speaking, calculate as it has been so produced with the second film in the series together. "Rapunzel" has cost measly $ 260,000,000. Unbelievable. I'm absolutely sure this is cheaper. I would also hope for with this film, the Disney Animation Studios also have shown that they can make acceptable and not everything has to be propped up by Pixar. Although executive producer John Lasseter was here.

PS: Here is a small promotional video for Rapunzel's hair healing!

Monday, January 10, 2011

Hotfile/kates Playground Zip

exit of Stadtwerke Wedel and Quick Born: coal-fired power plant project Brunsbüttel loses more and more Investors

According to information the Hamburger Abendblatt do Stadtwerke Wedel and Quickborn get out of the controversial coal-fired power plant project of the Tübingen consortium SüdWestStrom (SWS).

"The reason for the withdrawal is for an extension of maturities for the nuclear power plants," said Stadtwerke Wedel CEO Adam with cripple. Even more important is crippled but the environmental aspect was. The municipal utilities Wedel serve its residential customers for three years with energy, will produce no carbon dioxide in their production. CEO Adam cripple: "We have in recent years also engaged in other projects such as the participation in offshore wind farms."

The city works Quickborn have taken leave of this project, said CEO Uwe Timm. With 3.2 million € would participate Quickborn on the three-billion-euro project. Presumably, the public utility Quickborn now write off research costs 60 000 euro. "But with the lifetime extension of nuclear power plants and increased development of wind power plants, we see no more sound in the project, "says Timm. Also, the environmental concerns have played a role, because burden coal plants the environment." What is missing is the shareholders' resolution to get out we can. "

Thursday, January 6, 2011

What To Do To You Man Together Havung Shawer

New Year's gift

We want a all our friends and supporters . Happy New Year

And there's also a nice New Year gift:..

Obviously, all plans for coal power plants in Brunsbüttel smashed more than to the headline

Wednesday, January 5, 2011

How Often For A Hollywood Waxing

My wife, our children and I


Happy New Year! In the Christmas holiday I've also seen movies of course, lack of reasonable Internet connection, but nothing online. Here, then, strike one:

The Fockers are back - what will possibly go wrong? The first two are classic comedies, Ben Stiller has done it again, pull all the actors in front of the camera and also have to undertake other big names. Says Harvey Keitel as a bad-tempered construction worker, Laura Dern as a kindergarten director, and Jessica Alba (sweet as always) as something wacky Pharmareferentin.

Only: unfortunately not enough. Director Jay Roach produces only this time, the new man on the director's chair, you can not blame that "Little Fockers" (originally), only a pale imitation of the first films.

Yes, there could still be good gags and situations of such absurdity that there is a shake with laughter. Unfortunately, the sown rather thin, the conflicts as well, and just about everything that has identified the other two parts.

I'm not really angry now, but the money for the cards I could have saved me. Oh yes, according to Wikipedia the film had a budget of about $ 100 million. Where are they just gone? The film itself can certainly not have cost too much.

Tuesday, January 4, 2011

Asics Gel Sensei 3 Mt.

Stadtwerke Schleswig get off controversial construction of coal-fired power plant Brunsbüttel

Coal Information

protest According to media reports do Stadtwerke Schleswig dropped out of the construction of the SWS-coal power plant in Brunsbüttel. "The economics The project is called into question, "CEO Wolfgang Schoofs told the Schleswig messages. Stadtwerke justified the move by the decision of the Federal Government to extend the term of the nuclear power plants. In addition to the Schleswig public utilities already other companies had dropped out of the energy industry. That the power plant can be realized, at this stage unlikely, says the newspaper

150 000 euro, the public utilities have been invested in the coal project, half of the money was used for planning costs Schoofs... "We are fighting now that we the other half get back. "The company will instead more bring to the production of renewable energy. Specifically, it is an offshore wind farm to be built off Borkum. Of the total output of 400 megawatts, the utility will order a "two-megawatt disc.

Stadtwerke Schleswig come even without referendum to reason.